I am working in a project where the work item editor presentation has been modified to include a new tab called "Fixing and Documenting." The estimate, correction, and actual fix time fields have been moved to that tab.
As I have been updating the Actual Fix Time field in my work items, I'm noticing that the value in that field is overwritten. For example, in one work item, I entered 2.5 days as the actual fix time. I saved the work item and everything looked fine. However, when I refreshed the work item, value changed to 1800000 weeks. Has anyone seen behavior like this before? This is happening in version 404 of RTC. |