SCM report feasibility with birt
Environment
RTC 3.0.1.3 Is it possible to retrieve following data using BIRT if not then which tool can be helpful for this
|
Accepted answer
Yes. There's an out of the box report ( you may have to download the BIRT report design sources) called "Work Item Change Sets", but I used that as a basis for another report, and it does work.
Kaushik Bhalerao selected this answer as the correct answer
Comments
David MICHEL
commented Apr 06 '14, 4:36 p.m.
Hello Steven,
|
Your answer